| | 2 | Land Ownership Private
| |
| | 3 | Location Jones County, North Carolina
| |
| 4 | Forest Type Loblolly pine
| |
| | Context |  |
| | 5 | Is this project a part of a landscape plan? No
| |
| | 6 | In a Wildland Urban Interface (WUI)? No
| |
| | 7 | Acreage treated 4 ac
| |
| | 8 | Type of contract Not applicable
| |
| | 9 | Funding source North Carolina State University
| |
| | 10 | Collaborators and partners US Forest Service
| |
| | 11 | Project start date Mar. 2008
| |
| 12 | Project completion date Mar. 2008
| |
| | Treatment Goals |  |
| | 13 |
| |
| | 14 | Reduce fuel load
| |
| | 15 |
| |
| | 16 |
| |
| 17 | Forest Stand Improvement
| |
| | Treatment Specifics |  |
| | 18 | Primary treatment objective Fuel load reduction, equipment testing | |
| | 19 | How does biomass removal fit with other objectives? In the future, as a market for material
| |
| | 20 | Treatment description Understory removal from loblolly pond pine stand
| |
| | 21 | Description of contractors NCSU employees | |
| | 22 | Travel distance for contractors
| |
| | 23 | Type of equipment used Fecon FTX 440
| |
| | 24 | Treatment of residual slash if any
| |
| | 25 | Treatment cost per acre Break even at 10 tons/acre
| |
| 26 | Trucking costs Not applicable
| |
| | Utilization |  |
| | 27 | Products from project Dirty chips | |
| | 28 | Price for products
| |
| | 29 | Date of Sale
| |
| | 30 | Did biomass markets exist previous to project?
| |
| | 31 | Type of utilization
| |
| | 32 | How well did the woody biomass match the utilization options?
| |
| 33 | Distance to utilization
| |
| | Treatment guidelines, targets, limitations |  |
| | 34 | Diameter limit
| |
| | 35 | Basal area reduction
| |
| | 36 | Crown coverage
| |
| | 37 | Fuel loading
| |
| | 38 | Retention guidelines Removal of understory shrubs - no change in overstory
| |
| | 39 | Treatment of snags and downed logs
| |
| | 40 | Soil impacts
| |
| 41 | Other ecological impacts monitored
| |
| | Pre Treatment |  |
| | 42 | Fuel load
| |
| | 43 | Stem density (stems/ac) 60-80
| |
| | 44 | Basal area (ft2/ac) 40-60
| |
| | 45 | Canopy closure (%) 20% | |
| | 46 | Height to live crown base 24ft
| |
| | 47 | Snags and downed woody material Present
| |
| | 48 | Size class distribution 4-14"
| |
| | 49 | Tree species composition Upper pine/ lower gallberry red maple, bay
| |
| | 50 | Presence/absence of invasive species None noticed
| |
| 51 | Soil and other ecological data Pocosin organic soils
| |
| | Post Treatment |  |
| | 52 | Fuel load
| |
| | 53 | Stem density (stems/ac) same as pre-data
| |
| | 54 | Basal area (ft2/ac) same as pre-data
| |
| | 55 | Canopy closure (%) same as pre-data
| |
| | 56 | Height to live crown base same as pre-data
| |
| | 57 | Snags and downed woody material 3 tons to the acre residual cwd
| |
| | 58 | Size class distribution same as pre-data
| |
| | 59 | Tree species composition
| |
| | 60 | Presence/absence of invasive species
| |
| | 61 | Soil and other ecological data
| |